Water System Repair Project Phase 2, CLDJ, Djibouti
Completed Project
The work includes a Base Bid package which includes the installation of 0.5 MG steel elevated water storage tank, booster pump system, booster pump building, site improvements, 300 mm pipe, fiber optic cable, pump control systems, and appurtenances. Bid Option 1 includes the installation of various sizes of waterline to replace existing infrastructure, while Bid Option 2 includes the installation of two fire pump systems, two fire pump buildings, site improvements at the two sites, 300 mm replacement pipe, fire communication systems, control valves with vaults, and appurtenances and incidental related work.